Best answer:Business Statistics-Basic Data Review, assignment

Answer & Explanation:The following data consists of the actual time used and potential (the best time possible for this review process) to complete each step in the review process. The actual times are based on the review of 30 projects. The potential times are subjective engineering judgment estimates.Use the data in the table above and answer the following questions in the space provided below:able: Basic Data Review for Construction Project Equipment Arrangement Cycle Time (hours) Step Description Actual Potential Difference 1 Read basic data package 4 4 — 2 Write, type, proof, sign, copy, and distribute cover letter 21.9 0.5 21.4 3 Queue 40 0 40 4 Lead engineer calls key people to schedule meeting 4 0.25 3.75 5 Write, type, proof, sign, copy, and distribute confirmation letter 25.4 2.1 23.3 6 Hold meeting; develop path forward an

💡 Buy the answer for only $12 Get it now →

d concerns 4 4 — 7 Project leader and specialist develop missing information 12 12 — 8 Determine plant preferred vendors 12 12 — 9 Review notes from meeting 12 12 — 10 Resolve open issues 106 104 2 11 Write, type, proof, sign, copy, and distribute basic data acceptance letter 26.5 0.25 26.25 Totals 267.8 151.1 116.7 1.What are the sources of value-added and non-value-added work in this
process?2.Where are the main opportunities to improve the cycle time of this process,
with respect to both actual time used and the potential best times? What
strategy would you use?3.Step 10: Resolve Open Issues required 104 hours (potential) versus 106 hours
(actual). Is there an OFI here? Why or why not? If so, how would you attack
it?4.What do you think are the most difficult critical issues to deal with when
designing a sound cycle time study such as this one?

💡 Buy the answer for only $12 Get it now →